Mikael Hugo
7a6169705a docs: lock in fork stance, reframe cherry-pick list as reference-only
After attempting cluster B (4 surgical agent-session fixes), even the
first commit conflicted because of structural namespace divergence
(gsd_*→sf_* rename, @sf-run/*→@singularity-forge/* rename, prior
pi-mono direct cherry-picks). The conflicts are real semantic
divergence, not noise.

Conclusion: sf is a fork; we do not periodically sync from
gsd-build/gsd-2. Pretending we still track upstream means weeks of
merge work for diminishing return.

BUILD_PLAN.md adds an explicit "Upstream stance" section documenting
the fork posture and the rationale for the three irreversible naming
choices.

UPSTREAM_CHERRY_PICK_CANDIDATES.md is reframed as a reference list,
not an action plan. The clusters and SHAs remain useful as an
intelligence source — port specific fixes by hand when one bites us;
do not run automated cherry-picks against the list.

Pi-mono SDK syncs continue separately — that path doesn't have the
same divergence problem.

Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com>
2026-04-29 12:57:44 +02:00
Mikael Hugo
31842885ea docs: add BUILD_PLAN.md — tiered cut of v3 NEW items
Of the 56 NEW items in SPEC.md, not all are worth building for v3.
This plan groups them by tier:

- Tier 1 ESSENTIAL (~5 weeks): Vault resolver, sm integration decision,
  schema reconciliation, config alignment.
- Tier 2 STRONG (~3-4 weeks): doc-sync, intent chapters, PhaseReview
  3-pass, turn_status marker, last_error cap, cost_micro_usd.
- Tier 3 NICE (v3.1+): persistent agents, inter-agent messaging,
  workflow content pinning, runs table, pending_retain.
- Tier 4 DEFER: SSH workers, HTTP API auth, trace_index, PhaseUAT —
  build when a deployment demands it.
- Tier 5 DROP: items from late adversarial-review iterations that
  don't earn their keep (workflow_pins separate table, snap_ columns,
  agent_capabilities separate index).

Includes a recommended ~6-8 week v3.0 schedule and four decision
points that should be settled before starting work.

Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com>
2026-04-29 12:33:07 +02:00