Fix complete-milestone prompt with structured parameter definitions
Replace the free-form parameter listing in step 7 of complete-milestone.md with structured, typed parameter definitions that match the tool schema in db-tools.ts. Parameters are grouped into required and optional sections with explicit types (marking arrays as arrays, booleans as booleans) to prevent LLM validation failures when calling gsd_complete_milestone. Fixes #2581 Co-Authored-By: Claude Opus 4.6 (1M context) <noreply@anthropic.com>
This commit is contained in:
parent
7cf4084a1e
commit
36ff7ac4fe
1 changed files with 18 additions and 1 deletions
|
|
@ -35,7 +35,24 @@ Then:
|
|||
|
||||
**Success path** (all verifications passed — continue with steps 7–11):
|
||||
|
||||
7. **Persist completion through `gsd_complete_milestone`.** Call it with: `milestoneId`, `title`, `oneLiner`, `narrative`, `successCriteriaResults`, `definitionOfDoneResults`, `requirementOutcomes`, `keyDecisions`, `keyFiles`, `lessonsLearned`, `followUps`, `deviations`, `verificationPassed: true`. The tool updates the milestone status in the DB, renders `{{milestoneSummaryPath}}`, and validates all slices are complete before proceeding.
|
||||
7. **Persist completion through `gsd_complete_milestone`.** Call it with the parameters below. The tool updates the milestone status in the DB, renders `{{milestoneSummaryPath}}`, and validates all slices are complete before proceeding.
|
||||
|
||||
**Required parameters:**
|
||||
- `milestoneId` (string) — Milestone ID (e.g. M001)
|
||||
- `title` (string) — Milestone title
|
||||
- `oneLiner` (string) — One-sentence summary of what the milestone achieved
|
||||
- `narrative` (string) — Detailed narrative of what happened during the milestone
|
||||
- `successCriteriaResults` (string) — Markdown detailing how each success criterion was met or not met
|
||||
- `definitionOfDoneResults` (string) — Markdown detailing how each definition-of-done item was met
|
||||
- `requirementOutcomes` (string) — Markdown detailing requirement status transitions with evidence
|
||||
- `keyDecisions` (array of strings) — Key architectural/pattern decisions made during the milestone
|
||||
- `keyFiles` (array of strings) — Key files created or modified during the milestone
|
||||
- `lessonsLearned` (array of strings) — Lessons learned during the milestone
|
||||
- `verificationPassed` (boolean) — Must be `true` — confirms that code change verification, success criteria, and definition of done checks all passed before completion
|
||||
|
||||
**Optional parameters:**
|
||||
- `followUps` (string) — Follow-up items for future milestones
|
||||
- `deviations` (string) — Deviations from the original plan
|
||||
8. For each requirement whose status changed in step 6, call `gsd_requirement_update` with the requirement ID and updated `status` and `validation` fields — the tool regenerates `.gsd/REQUIREMENTS.md` automatically.
|
||||
9. Update `.gsd/PROJECT.md` to reflect milestone completion and current project state.
|
||||
10. Review all slice summaries for cross-cutting lessons, patterns, or gotchas that emerged during this milestone. Append any non-obvious, reusable insights to `.gsd/KNOWLEDGE.md`.
|
||||
|
|
|
|||