# What this PR does
- Fix logging when no error
- Add more logging to request errors during sync"
## Which issue(s) this PR closes
Related to [issue link here]
<!--
*Note*: If you want the issue to be auto-closed once the PR is merged,
change "Related to" to "Closes" in the line above.
If you have more than one GitHub issue that this PR closes, be sure to
preface
each issue link with a [closing
keyword](https://docs.github.com/en/get-started/writing-on-github/working-with-advanced-formatting/using-keywords-in-issues-and-pull-requests#linking-a-pull-request-to-an-issue).
This ensures that the issue(s) are auto-closed once the PR has been
merged.
-->
## Checklist
- [x] Unit, integration, and e2e (if applicable) tests updated
- [x] Documentation added (or `pr:no public docs` PR label added if not
required)
- [x] Added the relevant release notes label (see labels prefixed w/
`release:`). These labels dictate how your PR will
show up in the autogenerated release notes.
# What this PR does
- Compresses sync data being sent to engine
- Minor fix to log messages when JSON parse errors occur
## Which issue(s) this PR closes
Related to [issue link here]
<!--
*Note*: If you want the issue to be auto-closed once the PR is merged,
change "Related to" to "Closes" in the line above.
If you have more than one GitHub issue that this PR closes, be sure to
preface
each issue link with a [closing
keyword](https://docs.github.com/en/get-started/writing-on-github/working-with-advanced-formatting/using-keywords-in-issues-and-pull-requests#linking-a-pull-request-to-an-issue).
This ensures that the issue(s) are auto-closed once the PR has been
merged.
-->
## Checklist
- [x] Unit, integration, and e2e (if applicable) tests updated
- [x] Documentation added (or `pr:no public docs` PR label added if not
required)
- [x] Added the relevant release notes label (see labels prefixed w/
`release:`). These labels dictate how your PR will
show up in the autogenerated release notes.
- Split up sync requests into batches to run concurrently
- Add more logging for when API calls to Grafana fail to parse
- Call sync from backend plugin when status is called
- Lock sync from backend plugin to only run every 5 mins
- Add timer display for API call to sync to return remaining time before
sync can execute
- Remove locks from celery task since it's work is low cost and we lock
in the backend plugin anyways.
# What this PR does
New OnCall plugin initialization process
## Checklist
- [x] Unit, integration, and e2e (if applicable) tests updated
- [x] Documentation added (or `pr:no public docs` PR label added if not
required)
- [x] Added the relevant release notes label (see labels prefixed w/
`release:`). These labels dictate how your PR will
show up in the autogenerated release notes.
---------
Co-authored-by: Michael Derynck <michael.derynck@grafana.com>
Co-authored-by: Matias Bordese <mbordese@gmail.com>