# What this PR does
Add docs for schedule quality report feature.
## Which issue(s) this PR fixes
https://github.com/grafana/oncall/issues/1552
## Checklist
- [x] Unit, integration, and e2e (if applicable) tests updated
- [x] Documentation added (or `pr:no public docs` PR label added if not
required)
- [x] `CHANGELOG.md` updated (or `pr:no changelog` PR label added if not
required)
# What this PR does
## Which issue(s) this PR fixes
## Checklist
- [x] Unit, integration, and e2e (if applicable) tests updated
- [x] Documentation added (or `pr:no public docs` PR label added if not
required)
- [x] `CHANGELOG.md` updated (or `pr:no changelog` PR label added if not
required)
---------
Co-authored-by: Joey Orlando <joey.orlando@grafana.com>
# What this PR does
## Which issue(s) this PR fixes
## Checklist
- [ ] Unit, integration, and e2e (if applicable) tests updated
- [ ] Documentation added (or `pr:no public docs` PR label added if not
required)
- [ ] `CHANGELOG.md` updated (or `pr:no changelog` PR label added if not
required)
# What this PR does
Required for new Integrations page
<img width="674" alt="Screenshot 2023-04-04 at 20 32 03"
src="https://user-images.githubusercontent.com/2262529/229792240-60783f30-00ba-4dfc-bebd-75d6c2c232e3.png">
## Which issue(s) this PR fixes
## Checklist
- [ ] Unit, integration, and e2e (if applicable) tests updated
- [ ] Documentation added (or `pr:no public docs` PR label added if not
required)
- [ ] `CHANGELOG.md` updated (or `pr:no changelog` PR label added if not
required)
---------
Co-authored-by: Joey Orlando <joey.orlando@grafana.com>
…eld, refactor fields
# What this PR does
## Which issue(s) this PR fixes
## Checklist
- [ ] Unit, integration, and e2e (if applicable) tests updated
- [ ] Documentation added (or `pr:no public docs` PR label added if not
required)
- [ ] `CHANGELOG.md` updated (or `pr:no changelog` PR label added if not
required)
…ate in private api
# What this PR does
## Which issue(s) this PR fixes
## Checklist
- [ ] Unit, integration, and e2e (if applicable) tests updated
- [ ] Documentation added (or `pr:no public docs` PR label added if not
required)
- [ ] `CHANGELOG.md` updated (or `pr:no changelog` PR label added if not
required)
…private api
# What this PR does
## Which issue(s) this PR fixes
## Checklist
- [ ] Unit, integration, and e2e (if applicable) tests updated
- [ ] Documentation added (or `pr:no public docs` PR label added if not
required)
- [ ] `CHANGELOG.md` updated (or `pr:no changelog` PR label added if not
required)
# What this PR does
This PR adds new API endpoints for migrating routes from regex format to
jinja2 format. The changes include the following:
* `filtering_term_as_jinja2` field to GET `channels_filters` endpoint
* A POST endpoint
`channel_filters/ABCDEF123/convert_from_regex_to_jinja2/` for migrating
routes to jinja2 format.
These new endpoints will allow users to preview and migrate their
existing regex routes to the more flexible and maintainable jinja2
format.
Check the screenshot where this endpoints will be used
<img width="407" alt="Screenshot 2023-04-14 at 09 50 23"
src="https://user-images.githubusercontent.com/2262529/231920771-20792c7e-d6ef-4681-80e1-c82bb4aa4b8e.png">
## Which issue(s) this PR fixes
## Checklist
- [ ] Unit, integration, and e2e (if applicable) tests updated
- [ ] Documentation added (or `pr:no public docs` PR label added if not
required)
- [ ] `CHANGELOG.md` updated (or `pr:no changelog` PR label added if not
required)
# What this PR does
## Which issue(s) this PR fixes
## Checklist
- [ ] Unit, integration, and e2e (if applicable) tests updated
- [ ] Documentation added (or `pr:no public docs` PR label added if not
required)
- [ ] `CHANGELOG.md` updated (or `pr:no changelog` PR label added if not
required)
# What this PR does
- add new columns `gcom_org_contract_type`,
`gcom_org_irm_sku_subscription_start_date`, and
`gcom_org_oldest_admin_with_billing_privileges_user_id` to
`user_management_organization` table + `is_restricted` column to
`alerts_alertgroup` table
- emit two new Django signals
- `org_sync_signal` at the end of the
`engine/apps/user_management/sync.py::sync_organization` method
- `alert_group_created_signal` when a new Alert Group is created
## Checklist
- [ ] Tests updated (N/A)
- [ ] Documentation added (N/A)
- [x] `CHANGELOG.md` updated
---------
Co-authored-by: Rares Mardare <rares.mardare@grafana.com>
- Enable/Disable Toggle
- Add Integrations Filter
- Enable log for non-triggered webhook for troubleshooting
- Improve UI to better show enabled, trigger status, request status
- Standardize terms New, Firing, Triggered to Firing
- Mask password field
- Fix bug where UI did not update when webhook is deleted
- Change responses to be referenced by webhook ID rather than trigger
type
The routing of the OnCall plugin has changed and no longer uses URL
params
but instead uses paths. This link is used when declaring an Incident
from
the OnCall Slack alert and needs to match the correct pattern in order
for
Incident to correctly detect it.
# What this PR does
For example, changing the integration's team
```
curl "localhost:8080/api/v1/integrations/CLYV3QBVHDV3T/" \
--request PUT \
--header "Authorization: meow" \
--header "Content-Type: application/json" --data '{"team_id": "TWP6JJJN6LYZX"}'
```
## Which issue(s) this PR fixes
## Checklist
- [ ] Unit, integration, and e2e (if applicable) tests updated
- [ ] Documentation added (or `pr:no public docs` PR label added if not
required)
- [ ] `CHANGELOG.md` updated (or `pr:no changelog` PR label added if not
required)
# What this PR does
## Which issue(s) this PR fixes
## Checklist
- [ ] Unit, integration, and e2e (if applicable) tests updated
- [ ] Documentation added (or `pr:no public docs` PR label added if not
required)
- [ ] `CHANGELOG.md` updated (or `pr:no changelog` PR label added if not
required)
# What this PR does
Team search doesn't work when filtering by team:
<img width="331" alt="Screenshot 2023-03-30 at 15 48 50"
src="https://user-images.githubusercontent.com/20116910/228875971-0f55bdf8-6aa7-4759-9882-cdf7d11bb0c7.png">
This PR fixes it + adds backend unit tests.
## Checklist
- [x] Unit, integration, and e2e (if applicable) tests updated
- [x] Documentation added (or `pr:no public docs` PR label added if not
required)
- [x] `CHANGELOG.md` updated (or `pr:no changelog` PR label added if not
required)
# What this PR does
Allows changing team for escalation chains
## Which issue(s) this PR fixes
## Checklist
- [ ] Unit, integration, and e2e (if applicable) tests updated
- [ ] Documentation added (or `pr:no public docs` PR label added if not
required)
- [ ] `CHANGELOG.md` updated (or `pr:no changelog` PR label added if not
required)
---------
Co-authored-by: Ildar Iskhakov <ildar.iskhakov@grafana.com>
Co-authored-by: Vadim Stepanov <vadimkerr@gmail.com>
# What this PR does
Sometimes plugin sync fails with the following exception:
```
Cannot delete or update a parent row: a foreign key constraint fails (`schedules_oncallschedule`, CONSTRAINT `alerts_oncallschedul_team_id_4e633f4b_fk_user_mana` FOREIGN KEY (`team_id`) REFERENCES `user_management_team` (`id`))'
```
How to reproduce:
1. Create a new Grafana team
2. Create two schedules with different types (e.g. ICal and Web) and
assign both schedules to the new team
3. Delete the team in Grafana
4. Trigger plugin sync, the sync will fail with the exception above
This happens because the `OnCallSchedule` Django model is a polymorphic
model and there's a [known
bug](https://github.com/django-polymorphic/django-polymorphic/issues/229)
in `django-polymorphic` with deleting related objects when using
`SET_NULL` and `CASCADE`. This PR adds non-polymorphic versions of
`SET_NULL` and `CASCADE` to use in schedule FKs as per this
[comment](https://github.com/django-polymorphic/django-polymorphic/issues/229#issuecomment-398434412).
This also applies to two other schedule FKs: `organization` and
`user_group`, which are not working properly as well.
## Checklist
- [x] Unit, integration, and e2e (if applicable) tests updated
- [x] Documentation added (or `pr:no public docs` PR label added if not
required)
- [x] `CHANGELOG.md` updated (or `pr:no changelog` PR label added if not
required)
# What this PR does
## Which issue(s) this PR fixes
## Checklist
- [ ] Unit, integration, and e2e (if applicable) tests updated
- [ ] Documentation added (or `pr:no public docs` PR label added if not
required)
- [ ] `CHANGELOG.md` updated (or `pr:no changelog` PR label added if not
required)
# What this PR does
## Which issue(s) this PR fixes
## Checklist
- [ ] Unit, integration, and e2e (if applicable) tests updated
- [ ] Documentation added (or `pr:no public docs` PR label added if not
required)
- [ ] `CHANGELOG.md` updated (or `pr:no changelog` PR label added if not
required)
This PR cuts GitHub Action build times from 14-15 minutes, down to just
under 7 minutes. It does this by:
- caching `grafana-plugins/node_modules` and `pip` dependencies based on
their respective dependency files (eg. `requirements.txt` &
`yarn.lock`). This step alone saves ~3 minutes.
- get rid of the "build-engine-docker-image" and
"backend-integration-tests" jobs in the old "Integration Tests"
workflow. This was split out this way so that we could build the backend
docker image once, upload the artifact, and then reuse it across the
backend and e2e tests. We no longer need these backend integration tests
because we are testing the same thing in the e2e tests. This saves ~45
seconds of having to upload the image artifact.
- few improvements within the integration tests themselves:
- move plugin configuration to the `globalSetup.ts`. This means that
every test does not need to check if the plugin has been configured
because it is done once before all the tests are run.
- cache the plugin frontend build. If your commit doesn't change
anything to `grafana-plugin/src` or `grafana-plugin/yarn.lock` it should
be safe to reuse a previously built/cached version of the plugin
frontend. This saves ~3 minutes
- cache playwright binaries/dependencies. Only re-install them if the
version of `@playwright/test` in `grafana-plugin/yarn.lock` changes.
This saves ~3 minutes.
**Other things to mention**
Once we refactor the `GSelect` component to not call the `onChange`
callback on every keyDown event (#1628), this should allow us to
parallelize the integration tests, and cut the time required to execute
the tests themselves in half
# What this PR does
Before:
<img width="281" alt="Screenshot 2023-03-23 at 16 56 42"
src="https://user-images.githubusercontent.com/20116910/227279464-c883ec05-a964-4360-bda2-3443409ca90a.png">
After:
<img width="338" alt="Screenshot 2023-03-23 at 16 57 41"
src="https://user-images.githubusercontent.com/20116910/227279476-468bffba-922a-45ea-b400-5f34d6bf0534.png">
- Add scores for overloaded users, e.g. `(+25% avg)` which means the
user is scheduled to be on-call 25% more than average for given
schedule.
- Add score for gaps, e.g. `Schedule has gaps (29% not covered)` which
means 29% of time no one is scheduled to be on-call.
- Make things easier to understand when there are gaps in the schedule,
add `(see overloaded users)` text.
- Consider events for next 52 weeks (~1 year) instead of 90 days (~3
months), so the quality report is more accurate. Also treat any balance
quality >95% as perfectly balanced. These two changes (period change and
adding 95% threshold) should help eliminate false positives for _most_
schedules.
- Modify backend & frontend so the backend returns all necessary user
information to render without using the user store.
- Move quality report generation to `OnCallSchedule` model, add more
tests.
## Which issue(s) this PR fixes
Related to https://github.com/grafana/oncall/issues/1552
## Checklist
- [x] Tests updated
- [x] `CHANGELOG.md` updated
(public docs will be added in a separate PR)
# What this PR does
## Which issue(s) this PR fixes
## Checklist
- [ ] Unit, integration, and e2e (if applicable) tests updated (N/A)
- [ ] Documentation added (or `pr:no public docs` PR label added if not
required) (N/A)
- [x] `CHANGELOG.md` updated (or `pr:no changelog` PR label added if not
required)