# What this PR does
New OnCall plugin initialization process
## Checklist
- [x] Unit, integration, and e2e (if applicable) tests updated
- [x] Documentation added (or `pr:no public docs` PR label added if not
required)
- [x] Added the relevant release notes label (see labels prefixed w/
`release:`). These labels dictate how your PR will
show up in the autogenerated release notes.
---------
Co-authored-by: Michael Derynck <michael.derynck@grafana.com>
Co-authored-by: Matias Bordese <mbordese@gmail.com>
# What this PR does
- Run e2e tests using ops-devenv against environment that includes
OnCall & Labels
- Add first e2e test for Labels (creating new label key and value)
## Which issue(s) this PR closes
Closes https://github.com/grafana/oncall/issues/4083
<!--
*Note*: if you have more than one GitHub issue that this PR closes, be
sure to preface
each issue link with a [closing
keyword](https://docs.github.com/en/get-started/writing-on-github/working-with-advanced-formatting/using-keywords-in-issues-and-pull-requests#linking-a-pull-request-to-an-issue).
This ensures that the issue(s) are auto-closed once the PR has been
merged.
-->
## Checklist
- [x] Unit, integration, and e2e (if applicable) tests updated
- [x] Documentation added (or `pr:no public docs` PR label added if not
required)
- [x] Added the relevant release notes label (see labels prefixed w/
`release:`). These labels dictate how your PR will
show up in the autogenerated release notes.
# What this PR does
- introduce e2e tests in Tilt
- support e2e tests commands in Makefile
- stabilize local setup
## Which issue(s) this PR fixes
https://github.com/grafana/oncall/issues/3492
## Checklist
- [x] Unit, integration, and e2e (if applicable) tests updated
- [x] Documentation added (or `pr:no public docs` PR label added if not
required)
- [x] `CHANGELOG.md` updated (or `pr:no changelog` PR label added if not
required)
# What this PR does
Stabilize e2e tests by:
- improve usage of locators
- fix unreliable selectors
- prevent parallelism within the same test file
Additionally:
- configure eslint for e2e tests and fix existing errors/warnings
- bump Playwright version to latest stable
## Which issue(s) this PR fixes
https://github.com/grafana/oncall/issues/3217
## Checklist
- [x] Unit, integration, and e2e (if applicable) tests updated
- [x] Documentation added (or `pr:no public docs` PR label added if not
required)
- [x] `CHANGELOG.md` updated (or `pr:no changelog` PR label added if not
required)
# What this PR does
There are the following tests added:
- admin is allowed to edit other profiles
- editor is not allowed to edit other profiles
## Which issue(s) this PR fixes
https://github.com/grafana/oncall/issues/1586
## Checklist
- [x] Unit, integration, and e2e (if applicable) tests updated
- [ ] Documentation added (or `pr:no public docs` PR label added if not
required)
- [ ] `CHANGELOG.md` updated (or `pr:no changelog` PR label added if not
required)
---------
Co-authored-by: Rares Mardare <rares.mardare@grafana.com>
2023-08-02 15:42:48 +03:00
Renamed from grafana-plugin/integration-tests/utils/forms.ts (Browse further)