# What this PR does
- Changes the data type from `DateField` to `DateTimeField` on the
`final_shifts` API endpoint
- Accepts either a date or a datetime for the `start_date` and
`end_date` parameters (e.g. 2021-01-01 or 2021-01-01T01:00)
- Datetime granularity is in line with what is configurable on the
schedule i.e. `YYYY-MM-DD hh:mm`
- removes the rounding logic that modifies the query sent on the
database
## Which issue(s) this PR fixes
#3086
## Checklist
- [x] Unit, integration, and e2e (if applicable) tests updated
- [x] Documentation added (or `pr:no public docs` PR label added if not
required)
- [x] `CHANGELOG.md` updated (or `pr:no changelog` PR label added if not
required)
---------
Co-authored-by: Joey Orlando <joey.orlando@grafana.com>
When calculating on-call load, if an involved shift extends outside the
requested time span you can get unexpected results. Truncate the
returned events times to keep the details for the specified start/end
dates.
First step towards reusing `schedule.final_events` where current /
upcoming schedule shifts information is needed (eg. escalations, shift
notifications, etc)
# What this PR does
This PR:
- adds a few attributes to paginated API responses
- removes channel filter "send demo alert" internal API endpoint + tests
(this endpoint was marked as deprecated + not consumed by the web UI)
With the new paginated API response schema, the web UI will no longer
need to:
- hardcode `ITEMS_PER_PAGE` for each table
- manually calculate total number of pages
(these two things ☝️ will be done in
https://github.com/grafana/oncall/issues/2476)
For `GET /api/internal/v1/alertgroups` the response will now look like
this:
```diff
{
"next": <url> | None,
"previous": <url> | None,
"results": [],
++ "page_size": <int>
}
```
For all other paginated API responses, the response will now look like:
```diff
{
"count": <int>,
"next": <url> | None,
"previous": <url> | None,
"results": [],
++ "page_size": <int>,
++ "current_page_number": <int>,
++ "total_pages": <int>
}
```
## TODO
- [x] update public API docs to include these new attributes
## Checklist
- [x] Unit, integration, and e2e (if applicable) tests updated
- [x] Documentation added (or `pr:no public docs` PR label added if not
required)
- [x] `CHANGELOG.md` updated (or `pr:no changelog` PR label added if not
required)
# What this PR does
Makes sure that all viewset actions with `detail=True` use
`self.get_object()` to retrieve an instance that's being acted upon.
## Checklist
- [x] Unit, integration, and e2e (if applicable) tests updated
- [x] Documentation added (or `pr:no public docs` PR label added if not
required)
- [x] `CHANGELOG.md` updated (or `pr:no changelog` PR label added if not
required)
# What this PR does
Closes https://github.com/grafana/oncall-private/issues/1632
## Checklist
- [x] Unit, integration, and e2e (if applicable) tests updated
- [x] Documentation added (or `pr:no public docs` PR label added if not
required)
- [x] `CHANGELOG.md` updated (or `pr:no changelog` PR label added if not
required)
Allow PD migrator tool to migrate on-call shifts when migrating
schedules (currently it migrates schedules using PD ICal file):
https://github.com/grafana/oncall/issues/1283.
This PR will allow to select the mode of schedule migration via
`SCHEDULE_MIGRATION_MODE_WEB` env variable (`ical` or `web`). Due to
differences in the scheduling systems of PD and OnCall, it's not always
possible to migrate shifts automatically (migration plan will show any
schedules and layers that can't be migrated).
PD rotations that will be possible to migrate:
- Any rotation without restrictions ("restriction" is a PD term for
describing active periods for rotation)
- Daily rotations with daily restrictions
- Weekly rotations with weekly restrictions
- Some weekly rotations with daily restrictions
- Some daily rotations with weekly restrictions
There will be a separate PR to update the
[instruction](https://github.com/grafana/oncall/tree/dev/tools/pagerduty-migrator#readme)
since this one is pretty huge already.